HILTON HOTEL

Middletown, RI

 

The 105-room Hilton Hotel was designed to meet the latest RIDEM stormwater regulations.  Millstone provided engineering services including planning and zoning approvals, drainage and utility design and Landscape Architecture.  Our survey department was responsible for the topographic and property line survey as well as construction layout services.   Millstone was able to work with the Town to gain approvals in an aggressive timeframe.  The Hilton Hotel is currently under construction.

TIFFANY VILLAGE
Coventry, RI

 

The staff at Millstone guided this 168-unit multifamily project through the Comprehensive Permit process for State-mandated affordable housing.  Millstone engineers were responsible for many phases of design and permitting for this cornerstone development for the Town of Coventry.  Millstone worked closely with the Rhode Island Department of Environmental Management (DEM), Rhode Island Public Transit Authority (RIPTA), Rhode Island Housing, the regional water authority, the local sewer authority, and various Town departments to gain approvals for this project.  Construction is on-going for Tiffany Village.

 

The staff at Millstone pride themselves in the diversity of the projects successfully completed ranging from building additions to single family homes to large commercial developments covering hundreds of acres.

PROJECTS

POPLAR STREET DRIFTWAY

Newport, RI

The project was a design / build replacement of an urban pedestrian accessible boat launch open to the public.  The City maintains several of these along one of the waterfront sections of the city known as “The Point” section where residents are provided small boat launching access to Newport Harbor at the terminus of several public streets.  Millstone’s engineers procured the contract as the prime contractor on the project teamed with a local construction firm.  The project entailed the preparation of a precise existing conditions survey, demolition design of the existing ramp, engineering design of the new ramp, coastal and water quality permitting through state agencies, construction layout, oversight and inspection.  Permitted and constructed in the fall of 2009 and spring of 2010 respectively, it has been in operation ever since.  Careful protections were required to meet strict water quality standards during construction since excavation within the tidal zone was required. 

GODDARD PARK CARETAKERS HOUSE

Warwick, RI

 

The staff at Millstone Engineering was involved every step of the way from design and permitting through construction supervision of the On-Site Wastewater Treatment System for the Rhode Island Department of Environmental Management, Division of Parks and Recreation to service a new caretaker’s house at Goddard Park. The system was designed to accommodate three bedrooms and is located below an existing horse training corral.

HILTON HOTEL
Middletown, RI

 

The 105-room Hilton Hotel was designed to meet the latest RIDEM stormwater regulations.  Millstone provided engineering services including planning and zoning approvals, drainage and utility design.  Our survey department was responsible for the topographic and property line survey as well as construction layout services.   Millstone was able to work with the Town to gain approvals in an aggressive timeframe. 

THE BIRD HOUSE

Newport, RI

This new 13,000 sf home dubbed "The Bird House" with its adjoining "Blue Garden" restoration project sits adjacent to the exclusive Swiss Village Foundation located along Newport's Ocean Drive.

 

Providing Low Impact Development (LID) Site / Civil design services, Millstone has spearheaded utility, stormwater and erosion control designs all in concert with green sustainability initiatives such as rooftop rain capture / re-use as well as groundwater penetration protection systems. 

 

Architecturally designed by Paul Weber Architects and built by Parker Construction, Millstone has teamed with some of the industry's most trusted design professionals.  The entire project from design and permitting through construction and delivery is being performed in under 18 months.

TRUDEAU CENTER

​Coventry, RI

 

The J. Arthur Trudeau Memorial Center proposed to convert and existing traditional daycare facility into a care facility for autistic children.  The project consisted of expanding an existing parking field to provide the desired number of parking spaces for the proposed use.  


Millstone Engineering, P.C. was responsible for site, drainage and landscape architectural design required to obtain a construction permit from the municipality while balancing the needs of the client.  Millstone was heavily involved in construction administration as well as coordination with land surveyors during construction.